|
. |
Two projects have been constructed, a Case Study of SuperStorm '93, a famous midlatitude cyclone that paralyzed the eastern third of the United States in March of 1993, and Trusting the Forecast, where students actually make forecasts on a regular basis to gain a full appreciation for all the preparation involved in making an accurate forecast. These units have been designed to take up to three weeks of class time in order to complete. The navigation menu (left) for this module is called "Open-Ended Projects" and the menu items are arranged in a recommended sequence, beginning with this introduction. In addition, this entire web server is accessible in both "graphics" and "text"-based modes, a feature controlled from the blue "User Interface" menu (located beneath the black navigation menus). More information about the user interface options, the navigation system, or WW2010 in general is accessible from About This Server.
|